10 APPLICATION OF SETTINGS
10.4 SETTING EXAMPLE
10
The following setting values for the voltage differential 1 element between two tap voltages are programmed in the EnerV-
ista UR Setup software.
Note that match factor shown above assumes perfect bank balance. This must be adjusted when the bank is energized
during the differential function auto-setting procedure tune up.
The voltage differential element must be blocked during a VT fuse failure at any tap. The voltage differential element is
dependent on both source VTs. These VTs must be blocked if one or both of them has a VT fuse failure condition. There-
fore, as shown in the following figure, a blocking input for each element is created with FlexLogic™.
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...