5-208
C70 Capacitor Bank Protection and Control System
GE Multilin
5.8 INPUTS/OUTPUTS
5 SETTINGS
5
DIRECT INPUT 9 DEVICE ID
: "4"
DIRECT INPUT 9 BIT NUMBER
: "3"
DIRECT INPUT 9 DEFAULT STATE
: select "On" for security, select "Off" for dependability
Now the three blocking signals are available in UR IED 1 as
DIRECT INPUT 7 ON
,
DIRECT INPUT 8 ON
, and
DIRECT INPUT 9
ON
. Upon losing communications or a device, the scheme is inclined to block (if any default state is set to “On”), or to trip
the bus on any overcurrent condition (all default states set to “Off”).
Example 2: Pilot-aided schemes
Consider a three-terminal line protection application shown in the figure below.
Figure 5–105: THREE-TERMINAL LINE APPLICATION
Assume the Hybrid Permissive Overreaching Transfer Trip (Hybrid POTT) scheme is applied using the architecture shown
below. The scheme output operand
HYB POTT TX1
is used to key the permission.
Figure 5–106: SINGLE-CHANNEL OPEN-LOOP CONFIGURATION
In the above architecture, Devices 1 and 3 do not communicate directly. Therefore, Device 2 must act as a ‘bridge’. The fol-
lowing settings should be applied:
UR IED 1:
DIRECT OUT 2 OPERAND:
"
HYB POTT TX1
"
DIRECT INPUT 5 DEVICE ID:
"2"
DIRECT INPUT 5 BIT NUMBER:
"2" (this is a message from IED 2)
DIRECT INPUT 6 DEVICE ID:
"2"
DIRECT INPUT 6 BIT NUMBER:
"4" (effectively, this is a message from IED 3)
UR IED 3:
DIRECT OUT 2 OPERAND:
"
HYB POTT TX1
"
DIRECT INPUT 5 DEVICE ID:
"2"
DIRECT INPUT 5 BIT NUMBER:
"2" (this is a message from IED 2)
DIRECT INPUT 6 DEVICE ID:
"2"
DIRECT INPUT 6 BIT NUMBER:
"3" (effectively, this is a message from IED 1)
UR IED 2:
DIRECT INPUT 5 DEVICE ID:
"1"
DIRECT INPUT 5 BIT NUMBER:
"2"
DIRECT INPUT 6 DEVICE ID:
"3"
DIRECT INPUT 6 BIT NUMBER:
"2"
842713A1.CDR
UR IED 1
UR IED 2
UR IED 3
842714A1.CDR
UR IED 1
TX1
RX1
UR IED 2
RX2
TX2
RX1
TX1
UR IED 3
RX1
TX1
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...