GE Multilin
C70 Capacitor Bank Protection and Control System
9-7
9 THEORY OF OPERATION
9.1 OVERVIEW
9
Figure 9–3: COMPENSATED BANK NEUTRAL OVERVOLTAGE APPLICATION
b) BALANCED CASE
To understand neutral voltage unbalance protection, we can start with Kirchhoff's current law for the neutral node of the
bank:
(EQ 9.27)
This expression can be rearranged as follows.
(EQ 9.28)
Multiplying both sides by –1 /
C
A
and substituting the sum of the phase voltages with 3
V
0
yields:
(EQ 9.29)
As the left hand side of this equation is equal to zero, we can subtract it from the expression inside the absolute value
brackets in equation 8.25 to get:
(EQ 9.30)
The unbalance ratio
k
-values that reflect the initial or inherent bank unbalance are chosen as:
(EQ 9.31)
Therefore, as seen from the previous two equations, the initial operating signal will be zero.
834745A1.CDR
V
A
-V
X
V
A
A
B
C
V
X
I
C
I
B
I
A
I
A
+ I
B
+ I
C
= 0
C
C
C
B
C
A
I
A
I
B
I
C
+
+
j
ω
C
A
V
A
V
X
–
(
)
j
ω
C
B
V
B
V
X
–
(
)
j
ω
C
C
V
C
V
X
–
(
)
+
+
0
=
=
V
X
C
A
C
B
C
C
+
+
(
)
–
V
A
C
A
V
B
C
B
V
C
C
C
+
+
+
0
=
V
X
C
A
C
B
C
C
+
+
(
)
–
V
A
C
A
V
B
C
A
V
C
C
A
V
B
C
B
V
B
C
A
–
V
C
C
C
V
C
C
A
–
+
+
+
+
+
0
=
⇒
V
X
C
A
C
B
C
C
+
+
(
)
–
C
A
V
A
V
B
V
C
+
+
(
)
V
B
C
B
C
A
–
(
)
V
C
C
C
C
A
–
(
)
+
+
+
0
=
⇒
V
X
1
C
B
C
C
+
C
A
---------------------
+
⎝
⎠
⎛
⎞
3
V
0
–
V
B
1
C
B
C
A
-------
–
⎝
⎠
⎛
⎞
V
C
1
C
C
C
A
-------
–
⎝
⎠
⎛
⎞
+
+
0
=
V
OP
1
3
---
V
X
1
k
AB
k
AC
+
+
(
)
3
V
0
–
V
B
1
k
AB
–
(
)
V
C
1
k
AC
–
(
)
V
–
X
1
C
B
C
C
+
C
A
---------------------
+
⎝
⎠
⎛
⎞
3
V
0
V
B
–
1
C
B
C
A
-------
–
⎝
⎠
⎛
⎞
V
C
–
1
C
C
C
A
-------
–
⎝
⎠
⎛
⎞
+
+
+
=
1
3
---
V
X
k
AB
C
B
C
A
-------
–
k
AC
C
C
C
A
-------
–
+
⎝
⎠
⎛
⎞
V
B
C
B
C
A
-------
k
AB
–
⎝
⎠
⎛
⎞
V
C
C
C
C
A
-------
k
AC
–
⎝
⎠
⎛
⎞
+
+
=
k
AB
C
B
C
A
-------
,
k
AC
C
C
C
A
-------
=
=
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...