GE Grid Solutions
iBox/iBox Kit
Installation and Maintenance Guide
GE Information
994-0047-5.10-4
171
MODIFICATION RECORD
Version Revision Date
Change Description
4.00
1
March 23, 2005
Document updated for iBox Kit.
2
August 18, 2005
Updated to reflect new calculator procedures
5.00
1
October 21, 2005 Updated for ConfigPro 6 and AC Analog Input Module
2
February 8, 2006 Added info regarding CE Mark, protective earth terminal, and power
supplies.
3
April 10, 2006
Updated info about power supply & protective enclosure.
4
October 5, 2006
Created Appendix G: Error Messages (Control and Analog requests
error codes). Added info regarding Trip/Close operation in Digital Output
Verification Test.
Refer to Clarify Case# 20060727-0259
October 11, 2006 Clarify Case: 20060605-0257-1: Updated document to clarify on DO
wiring (Digital Output section in 2.5 Connecting and Testing Field
Wiring).
5
January 21, 2009 Minor updates throughout to reflect product enhancements.
6
March 25, 2009
Documented Ethernet module pass-through switch and configuration file
modifications.
5.10
0
February 10,
2010
Updated appendices B and E.
1
June 6, 2014
Corrected ground connections in the drawings of the Digital Outputs
section. Corrected the ground reference (chassis ground) in the first
Caution in the Terminal Connections section.
Add section: Removing Configuration Data and Sensitive Information
from the iBox.
2
July 30, 2014
Added Appendix F: Installing and Connecting DNP3 I/O Modules
3
Sep 11, 2014
Fixed links.
4
May 15, 2017
Replaced references to ConfigPro with SGConfig.
Updated GE branding and contact information.
Added information on battery “PULL” tab removal during iBox
installation.
AUTHENTICATION RECORD
VERSION
REV.
DATE
AUTHOR
CHANGE DESCRIPTION
5.00
6
March 25, 2009
E. Stuhr
Configuring the Ethernet Module
5.10
0
February 10, 2010 E. Stuhr
Appendices B and E.
Summary of Contents for iBox
Page 172: ......