iBox/iBox Kit
Installation and Maintenance Guide
GE Grid Solutions
40
994-0047-5.10-4
GE Information
Configuring Application Firmware
Overview
The iBox uses the
D25 Plant I/O Subsystem
(P097) Data Collection Application to
configure the digital inputs. Configure the iBox Plant I/O before you configure the
points in the
System Point Database
application.
Procedure:
Digital Input
Configuration
To configure the DC digital inputs:
Step
Action
1
Configuring the iBox PPP Driver and Internet Data
2
Double-click the
D25 Plant I/O Subsystem
icon.
Result:
The
D25 Plant I/O for iBox
dialog box appears.
3
Double-click the
DC Configuration
icon.
Result:
The
D25 DC Configuration for iBox
dialog box appears.
4
On the
General
tab, select the type of digital input board from the
First
Digital Input
board list. Select one of:
•
C: iBox 8 channels, 24 V wetting
•
D: iBox 8 channels, 48 V wetting
•
E: iBox 8 channels, 125 V wetting
The other board settings are preset.
Result:
The letter in the Device Code changes to match your selection.
Note:
Refer to the on-line help in SGConfig for details on configuring
the
I/O Configuration
and
Advanced
tabs.
Other
Application
Configuration
Configure your other applications before continuing to install the iBox. Each
application has its own configuration process. Refer to the documentation for your
specific applications for configuration information.
Summary of Contents for iBox
Page 172: ......