42
11
Workflow: Running
Automatic Measurements
11.1
Introduction to the Interval Mode
In the interval mode scheduled measurements and calibrations are performed
in a continuous and predefined sequence. It is possible to activate also
Calibrations and Cleaning. The latest release of GC-IMS-Silox Firmware provides
a full flexibility to define the measurement intervals, as well as calibration and
cleaning intervals.
All substance calibrations associated with the selected application
mode are modified within the interval mode when calibrations are
activated. Make sure that an appropriate calibration gas source is
connected to the Testgas In socket at the rear of the housing.
A calibration only works within certain margins around the factory
calibration. When it varies too much from the factory calibration the
user is informed and the results of the calibration process are
discarded.
Note:
A calibration has higher priority than a measurement. When a calibration
and a measurement collide according to the interval scheduling the
measurement is skipped (illustration shows example durations that may differ
from actual durations) and a Cleaning Cycle overrides Calibration and
Measurement with top priority:
Summary of Contents for GC-IMS-SILOX
Page 1: ...G A S Gesellschaft f r analytische Sensorsysteme mbH GC IMS SILOX USER MANUAL...
Page 66: ...65 7 Close the dialog with Close The import process is completed...
Page 103: ...102 17 10 2 System Page Plan Tab Figure 22 The System Page Plan...
Page 128: ...127 Exemplary Readout on Modbus...
Page 136: ...135 Figure 31 Results Window...