44
Any cleaning process must be completed ~2 hours prior to any
measurement so that the internal components can cool down to the
required temperatures.
This must be taken into account also if cleaning cycles are introduced in
the interval schedule
Before every measurement and before every calibration the RIP and the
default parameters are tested. In case this test fails the measurement is
invalidated or the calibration is skipped.
1
Select mode button:
Start
›
INTERVAL
.
2
Select in the start dialog
Interval Mode
›
Measurement
–
Start Time / Every
: The start
of the the first measurement
and the repe-tition rate can be
defined. Example: Defined
Start Time
and MEA
Every
2
hours.
The minimum interval
time set in
Every
must be
longer
than
the
Measurement Program.
Summary of Contents for GC-IMS-SILOX
Page 1: ...G A S Gesellschaft f r analytische Sensorsysteme mbH GC IMS SILOX USER MANUAL...
Page 66: ...65 7 Close the dialog with Close The import process is completed...
Page 103: ...102 17 10 2 System Page Plan Tab Figure 22 The System Page Plan...
Page 128: ...127 Exemplary Readout on Modbus...
Page 136: ...135 Figure 31 Results Window...