2.5.3 Lightning
Strike
Maintenance
Proper electrical bonding of all metallic components is critical for the protection against the effects of
lighting. Severe corrosion may inhibit a component’s ability to bond to the aircraft’s electrical ground
plane.
The following summarizes maintenance practices which are implemented to maintain adequate lightning
protection for the aircraft. See Section 4, Table 4-1 for exact maintenance requirements and associated intervals:
•
A
1000-hour
visual inspection of all G1000 equipment
, including voltage suppressors, resistors, fuses,
etc.
•
A
n electrical bonding check
of G1000 equipment every 1000 hours or anytime a lightning strike occurs
or is suspected
.
•
Regular replacement (every 2 years) of all five 3.2 Amp slow-blow fuses ensures they are in fresh
condition.
•
Replacement of voltage suppressors, resistors, and fuses anytime a lightning strike occurs or is suspected.
Summary of Contents for Diamond DA40
Page 1: ...190 00303 03 January 2007 Revision 6 G1000 System Maintenance Manual Diamond DA 40...
Page 130: ......
Page 137: ...G1000 DA40 System Maintenance Manual Page A 3 190 00303 03 Revision 6 A 4 Parts List...
Page 138: ...G1000 DA40 System Maintenance Manual Revision 6 190 00303 03 Page A 4...