166
Upgrade and Maintenance Manual
BX900
S2
Front docking board
©
c
og
ni
ta
s.
Ge
se
lls
ch
ft f
ür T
ec
hn
ik
-Dok
u
m
ent
at
ion m
b
H 20
11
P
fad
: C
:\P
ro
gr
am
m
e\
F
C
T
\ti
m
_
app
\ti
m
_
loc
al
\w
o
rk
\WA
LT
E
R
\O
B
J_D
OK
U
-13
67
0-
00
1.
fm
Ê
Remove the old LCD cable from the Local Service Display and connect the
new one, see
"Connecting cable to the Local Service Display" on page 154
.
Ê
Reinstall the Local Service Display as described in
"Inserting the Local
Service Display" on page 154
.
11.2.5 Concluding steps
Perform the following procedures to complete the task:
Ê
If applicable, reinstall the server blades and storage blades in their old slots
as described in section
"Removing / installing server blades and storage
blades" on page 54
.
Ê
Reconnect the AC power cords to the PSUs and secure them with cable ties
as described in section
"Connecting the system unit to the mains" on
page 50
.
Ê
If applicable, close the rack door as described in section
"Closing the rack
door" on page 60
.
Ê
Switch on the system unit as described in section
"Switching on the system
unit" on page 52
.
Ê
Store your system units system information on the Chassis ID EPROM
integrated into the front docking board. For further information on how to
obtain and use the
ChassisId_Prom
Tool, refer to section
"Using the Chassis
ID Prom Tool" on page 82
.