![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx900-s2/primergy-bx900-s2_upgrade-and-maintenance-manual_121016110.webp)
110
Upgrade and Maintenance Manual
BX900
S2
Connection blades
©
c
og
ni
ta
s.
Ge
se
lls
ch
ft f
ür T
ec
hn
ik
-Dok
u
m
ent
at
ion m
b
H 20
11
P
fad
: C
:\P
ro
gr
am
m
e\
F
C
T
\ti
m
_
app
\ti
m
_
loc
al
\w
o
rk
\WA
LT
E
R
\O
B
J_D
OK
U
-13
65
9-
00
1.
fm
8.1.2.1
Port assignment of switch connection blades
With the mezzanine cards, the assignment of the ports to the connection blade
slots can be defined via the management blade. The following table shows the
different options.
For more information on configuring the connection blades, see the manual
"PRIMERGY BX900 Blade Server Systems ServerView Management Blade S1
User Interface Description" and the documentation for the relevant connection
blades.
mezzanine card
Mezzanine card slot (M)
Connection blade slot (CB)
Port (P)
Port (P)
FC 8Gb/s
M1.P0
CB3
M1.P1
CB4
M2.P0
CB5
M2.P1
CB6
LAN 1GbE
M1.P1 / M1.P3
CB3.P1 / CB3.P2
M1.P2 / M1.P4
CB4.P1 / CB4.P2
M2.P1 / M2.P3
CB7.P1 / CB7.P2
M2.P2 / M2.P4
CB8.P1 / CB8.P2
LAN 1GbE
M2.P1 / M2.P3
CB5.P1 / CB5.P2
Option 2
M2.P2 / M2.P4
CB6.P1 / CB6.P2
LAN 1GbE
M2.P1 / M2.P3
CB5.P1 / CB7.P2
Option 3
M2.P2 / M2.P4
CB6.P1 / CB8.P2
LAN 10GbE / 10Gb CNA
M1.P1
CB3.P1
M1.P2
CB4.P1
M2.P1
CB5.P1
M2.P2
CB6.P1
Infiniband
M1.P1
---
M1.P2
CB3/CB4
M2.P1
CB7/CB8
M2.P2
CB5/CB6
SAS 6Gb
M2.P1
CB5.P1
M2.P2
CB6.P1
Table 8: Port assignment of connection blades and mezzanine cards