Installing a second management blade
9.2.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Installing connection blades: tool-less
9.2.2
Preliminary steps
Before installing a management blade, perform the following steps:
Ê
If applicable, open the rack door as described in section
"Opening the rack
door" on page 48
.
Ê
Locate the desired system unit as described in section
"Determining the
error class" on page 45
.
Ê
Connect a field service terminal to the installed management blade as
described in section
"Accessing the management blade web interface" on
page 44
.
Ê
Take a note of the firmware version of the installed management blade as
described in section
"Looking up the management blade firmware version"
on page 66
.
9.2.3
Removing the management blade dummy module
Ê
Remove the management blade dummy module from the unused
management blade bay.
Field Replaceable Units (FRU)
average hardware task duration: 5 minutes
average software task duration: 10 minutes