![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx900-s2/primergy-bx900-s2_upgrade-and-maintenance-manual_121016060.webp)
60
Upgrade and Maintenance Manual
BX900
S2
Basic hardware procedures
©
c
og
ni
ta
s.
Ge
se
lls
ch
ft f
ür T
ec
hn
ik
-Dok
u
m
ent
at
ion m
b
H 20
11
P
fad
: C
:\P
ro
gr
am
m
e\
F
C
T
\ti
m
_
app
\ti
m
_
loc
al
\w
o
rk
\WA
LT
E
R
\O
B
J_D
OK
U
-13
65
4-
00
1.
fm
Figure 11: Installing a dummy server blade module
Ê
Push the dummy server blade into the empty slot until it clicks into place.
4.7
Concluding software tasks
Ê
Perform the following software tasks to put the system unit back in
operation:
–
"Verifying the management blade time settings" on page 70
–
"Viewing and clearing the System Event Log (SEL)" on page 71
4.8
Closing the rack door
The PRIMECENTER rack is equipped with a split front door. The left-hand door
contains an interlocking system that can be locked and opened with a key.
Optionally, a revolving door knob can be mounted for key-less locking. To close
and lock the rack, proceed as follows:
Ê
Close the right-hand door first, then the left-hand door.
1