![background image](http://html.mh-extra.com/html/fujitsu/primergy-bx900-s2/primergy-bx900-s2_upgrade-and-maintenance-manual_121016191.webp)
BX900 S2
Upgrade and Maintenance Manual
191
Appendix
13.3.3.3 Connection Blade GbE Switch/IBP 36/8+2 (SB11)
Figure 84: Connection Blade GbE Switch/IBP 36/8+2
1
Status indicator (green/orange)
Lights up green: Power supply is supplied to the connection blade
Flashes orange: Connection blade error
Dark:
Power supply is not supplied to the connection blade
2
ID indicator (blue)
Lit:
ID indicator was activated via the management blade
Dark:
Normal operation
3
Stacking port 1 (internal) (green)
Lit:
Stacking port 1 is available
Flashes green:
Stacking port 1 is active
Dark:
Stacking port 1 is not available
4
Stacking port 2 (external) (green)
Lit:
Stacking port 2 is available
Flashes green:
Stacking port 2 is active
Dark:
Stacking port 2 is not available
5
Stacking (green/orange)
Lights up
yellow:
Connection blade is stack master
Flashes yellow:
Connection blade cannot perform role of master
Lights up green: Connection blade is stack slave
Flashes green:
Master selection process is active
Dark:
Connection blade does not belong to a stack
1
2 3 4 5
6 7
8
9
A
B
C