Chapter 1: DS850 Overview
14
EVS5200_DOC_SOP_DS850
Training is determined at the time the system is purchased.
What checklist should be followed?
Use the
to ensure that the system has been delivered and is
performing as expected.
System Acquisition Procedures
Use the
to ensure that the system has been delivered and is
performing as expected. The following is a descriptive list of the DS850 acceptance
testing criteria.
Visual Inspection
Ensure that there are no scratches or gouges on any part of the unit.
Verify that all labels are placed in their appropriate place and in their correct
orientation.
Check the wheel locks on the table to ensure the cart rolls freely in the unlocked
position and does not when the wheels are locked.
Inspect the table’s folding extensions and drawer for proper operation.
Verify all locks and doors have a smooth function and are locked.
Open the rear door on the scanner and check for any loose connections or damaged
parts.
Ensure that all belts, transport rollers, and protective guards are in place.
Physical Inspection
Install the UPS, connect the printers and the scanner to the UPS, set up the printers,
and then turn on the UPS and the scanner. See
Chapter 5: Pre-Election Day Tasks
instructions.
Observe that both printers and the DS850 power on. If an election has been loaded,
at the Login screen, enter the Election Code.
Verify that the AC power icon is present in the upper right-hand corner of the screen
and that it indicates that the power connection is plugged in.
Verify that a red “X” is not displayed on the printer icons.
Perform Touch Screen calibration by selecting the Hardware menu and then pressing
Screen Calibration
. Touch the circle in the upper left-hand corner. When the screen
with a circle in the lower right-hand corner appears, touch that circle. Touch the next
screen in multiple places to verify that the pointer (x) will follow the touch points.
Then press the
Save & Exit
button.