
Getting Started
3.2
Powering the SVP 2000 Video Processor
3.2.1
Before Powering Up
Before powering up the SVP 2000 Video Processor, check that:
1. The unit has been installed in a suitable location.
2. The unit has been connected to external equipment and power supply, as
required.
3. The power supply has been checked and a good earth provided.
3.2.2
Powering Up
The unit supply switch is located behind the front panel.
Figure
3.2 Items Behind the Front Panel
To power up the unit:
1. With all signal and power cables connected as required, turn on the unit using
the power switch. The SVP 2000 executes a series of power-up initialisation and
self-test routines.
Note:
The boot time for the unit is approximately one minute.
2. Confirm that the green LED is lit showing that the unit is receiving power.
Caution!
This equipment should not be operated unless the cooling fans are working and
there is free-air flow around the unit.
EN/LZT 790 0046/1 R1A
3-4
Summary of Contents for SVP 2000
Page 1: ...SVP 2000 Video Processor Software Version 3 0 and later REFERENCE GUIDE EN LZT 790 0046 1 R1A...
Page 24: ...Introduction EN LZT 790 0046 1 R1A 1 16 BLANK...
Page 36: ...Getting Started BLANK EN LZT 790 0046 1 R1A 3 2...
Page 50: ...Encoder Web based GUI Control BLANK EN LZT 790 0046 1 R1A 4 4...
Page 61: ...Encoder Web based GUI Control Figure 4 8 TS Input Tabbed Page EN LZT 790 0046 1 R1A 4 15...
Page 98: ...Decoder Web based GUI Control BLANK EN LZT 790 0046 1 R1A 5 4...
Page 140: ...Software Licensing and Upgrades BLANK EN LZT 790 0046 1 R1A 6 2...
Page 146: ...Fault Finding and Troubleshooting BLANK EN LZT 790 0046 1 R1A 7 2...
Page 176: ...Glossary EN LZT 790 0046 1 R1A A 22 BLANK...
Page 190: ...Events Descriptions BLANK EN LZT 790 0046 1 R1A C 2...