PERIODICAL INSPECTION SCHEDULE
The following schedule shows inspections that must be carried out after specified periods
of time or after incidents mentioned:
Period of time
Perform inspection/check position:
After first 2 hours of flight
1, 2, 3, 4, 5, 6, 7, 8, 12
After first 5 hours of flight
1, 2, 3, 4, 5, 6, 7, 8, 12
After 100 hours of flight or annually
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12,13
After hard landing
1, 2, 3, 5, 6
Safe and correct operation of the plane may be assured by systematic maintenance and
inspections of the airframe and power plant. The activities must be performed after periods
specified in Flight and Maintenance Manual of the Plane, and power plant and propeller
manuals.
6. LIFE CYCLE OF ASSEMBLIES
Item
Assembly
Life cycle
1
Airframe
- composite structure
- metal components of the
structure
- control system components
Depending on technical condition
2
Engine ROTAX 912 UL
According to updated technical bulletins
issued by the manufacturer.
3
Propeller AS 1700/1950
Depending on technical condition; see
manual for the AS type propellers
4
Cockpit instruments (pneumatic
and electric)
Depending on technical condition
5
Radio and other electronic
equipment
According to the updated manuals and
instructions of respective
manufacturers.
6
Rubber pipes for fuel and oil
Depending on technical condition but
no longer than 6 years counted from
the year of production
7
Rubber shock absorbers of the
front wheel
8
Tires and inner tubes
9
Rubber dampers in the engine
frame