Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, Maintenance and Periodic Inspections
Manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
42
9.3.1.6
Removal of the main rod
T.12.630.00.01 (can be performed
only after removal of the elevator unit)
1. Disconnect the rod T.12.630.00.01 from the intermediate lever
12.621.01.03 – Pic. 9.3.9 (remove the cotter pin, undo the nut and
remove the eye J.12.131.00.01 from the pin).
2. Replace the plastic that covers the inspection hole in the rear part of the
fuselage, under the elevator unit.
3. Loosen the limiter bolts J.12.630.04.01 – (Pic. 3.9.10)
4. Through the inspection hole disconnect the rod T.12.630.00.01 joint eye
J.12.630.05.01 from the ball J.12.640.01.00 (Pic. 9.3.11, 9.3.13 &
9.3.14)
As shown in the Pic. 9.3.14:
- put the locking wedge under the spring (1)
- lift the spring (2)
- move the head
J.12.630.05.01 of the rod from the ball (3)
T.12.630.01K.0
J.12.131.00.01
J.12.630.05.01
Nut M6 DIN 934
rod T.12.630.00.01
front
ty
ł
Pic. 9.3.2
Pic. 9.3.16
Pic. 9.3.17