Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, maintenance and periodic inspections
manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
163
f. Put the barb fitting on the upper rubber hose and secure with
the clamp W1 18-20
g. Connect the oil hose J.15.256.00.00 to the oil cooler (see the
point „a”)
Connect the oil pipe J.15.256.00.00 to the oil pump barbed fitting and secure
with the clamp W1 18-20 (see the picture in point „b”)
9.4.5 ENGINE COOLING SYSTEM
1. Engine cooling system diagram
E – engine
P – coolant pump
R – radiator
D – expansion tank
L – surge tank
C – carburetors
1 – the-way manifold of the pump J.15.505.00.00
2 – thermostat J.15.501.00.00
3 – three-way manifold J.15.500.04.00
4 – heating J.15.502.00.01
5 – right hose J.15.500.01.01
6 – left hose J.15.500.02.01
7 – hose J.15.500.07.00
8 – hoseJ.15.500.08.00
9 – heating hose J.15.502.02.00
10 – heating hose J.15.502.03.00
11 – heating hose J.15.502.04.00
12 – hose J.15.500.09.00
13 – heating control J.12.460.00.00
2. Coolant pump cover with barbed outlets/inlets and installation of the
three-way manifold
−
Body of the pump with mounting bolts as delivered by Rotax
Dwg. 9.4.5.1