Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, maintenance and periodic inspections
manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
116
special attention to correct position of the pump
- flow direction must be
according to the arrow stamped on the pump body (see the below picture)
−
Connect the fuel pipes J.15.407.00.00 i J.15.400.10.01 to the barb
fittings J.15.400.14.00 and secure with clamps W1 13-15
−
Connect the electric cable connector
17. Installation of the fuel pressure sensor
−
Connect the sensor to the diagonal former with the clamp Rubber
P-CLIP D35, bushing J.15.400.17.00, bolt M4x30 DIN 7985,
washer
Ø
4 DIN 9021 and nut M4 DIN 934, securing the conection
with thread sealant. All parts of the assembly are shown in the
below picture.
Pic. 9.4.3.40