Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, maintenance and periodic inspections
manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
164
1. Gasket
2. Cover
3. Bolt M6x90 – DIN 912
4. Bolt M6x35 – DIN 912
5. Bolt M6x35 – DIN 912
6. Sealing ring
7. O-ring
8. Inlet elbow
9. Bolt M6x20 – DIN 912
−
Unscrew the bolts (9) and remove the inlet elbow (8)
−
Remove the pump cover by unscrewing the cover mounting bolts
(3, 4 & 5). The below drawing shows factory set of the fitting in the
pump
−
Unscrew the inlet fittings, clean the threads and change position of
the inlet fittings according to the below drawing
Dwg. 9.4.5.2
Dwg. 9.4.5.3