Unscrew the bracket J.15.250.03.00 from the reducer body and
remove the cooler
3. Installation of then oil tank
−
Fix the tank using clamping rings J.15.250.09.00 and brackets
J.15.250.08.00 and secure with nuts M4 DIN 982 inside the cockpit
(see the picture in point 1)
−
Connect the oil hose J.15.254.00.00 to the tank barb fitting (see
point 10 in the procedure 9.4.6)
−
Connect the breather pipe to the barb fitting on the oil tank (see
point 10 in the procedure 9.4.6)
−
Connect the oil hose J.15.255.00.00 to the barb fitting on the oil
tank (see the point 10 in the procedure 9.4.6)
−
Check oil level and fill up if necessary, according to
recommendations placed in the Operation Manual of Rotax
Engines
4. Installation of the oil cooler
−
Brackets J.15.250.02.00 & J.15.250.03.00 should be mounted with
rivets to the oil coolers, according to the assembly drawing
J.15.257.00.00
J.15.250.03.00