
Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, Maintenance and Periodic Inspections
Manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
2
CONTENTS
PAGE
1 SMALL REPAIRS
2
2 PREPARATION OF THE AIRCRAFT FOR LONG-TERM
SUSPENSION OF OPERATION
4
3 WORKS TO BE DONE AFTER THE LONG-TERM
SUSPENSION OF OPERATION
5
4 ROUTINE MAINTENANCE LIST
5
5 PERIODICAL INSPECTION SCHEDULE
6
6 LIFE CYCLE OF ASSEMBLIES
6
7 ASSEMBLY AND DISASSEMBLY OF THE AIRCRAFT
7
8 ADJUSTMENT POINTS OF THE CONTROL SYSTEM
12
9.1 FRONT UNDERCARRIAGE
15
9.2 MAIN UNDERCARRIAGE
24
9.3 CONTROL SYSTEMS
33
9.3.1 RUDDER CONTROL SYSTEM
33
9.3.2 ELEVATOR AND AILERONS CONTROL SYSTEM
47
9.3.3 FLAPS DRIVE SYSTEM
57
9.4 POWER PLANT
62
9.4.1 ENGINE MOUNTING SYSTEM
62
9.4.2 ENGINE CONTROL SYSTEM
87
9.4.3 FUEL SYSTEM
95
9.4.4 ENGINE LUBRICATION SYSTEM
118
9.4.5 ENGINE COOLING SYSTEM
127
9.5 AIRFRAME STRUCTURE
145
9.5.1 DOORS
145
9.5.2 REPLACEMENT OF GLAZING
153