Maintenance
4-49
7
1
2
3
4
5
REPLACING A PRIMARY DC CONVERTOR POWER SUPPLY CABLE FUSE
AVAILABILITY
• No mission capable
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 5 minutes
TOOL(S)
• 1 standard tool box
PRELIMINARY OPERATION(S)
• Set the “I/O” switch (see Plate 6.IV, item 9) on the primary convertor (item 6) to “O”.
• Connect all the cables on the front panel (see Plate 6.VII item 9).
• Cut or disconnect the external DC source.
SHEET
E-2