Maintenance
4-15
7
1
2
3
4
5
IDR IDO 3G TEST
AVAILABILITY
• No mission capable
FREQUENCY
• 1 year and after each corrective maintenance operation
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 30 minutes
TOOL(S)
• 1 standard tool box
• 1 power reflection meter fitted with a power sensor for measuring power output between
30 and 45 dBm
• 1 torque wrench for tightening the N connector, torque 500 N.cm
• 2 TETRAPOL radio terminals correctly configured
• Control and configuration PC The use of the control and configuration PC is described in
Section 3.4.
PRODUCT(S) / CONSUMABLE(S)
• Not applicable
PRELIMINARY OPERATION(S)
• Check that the “I/O” switch (see Plate 6.IV, item 2 or 9) on the front panel is at “O”.
SHEET
P-2