Maintenance
4-51
7
1
2
3
4
5
REPLACING THE SYNCHRONISATION BOARD
AVAILABILITYE
• No mission capable
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 10 m rollout of Sheet P-3 to check the SYNC reference frequency
(around 30 minutes)
TOOL(S)
• 1 standard tool box
• 1 set of anti-static equipment
• Equipment in Sheet P-3
PRELIMINARY OPERATION(S)
• Install the anti-static equipment (armband, cables, mat).
• Remove the upper cover (see Plate 6.I, item 1).
• Put on the anti-static armband.
SHEET
E-3