Maintenance
4-47
7
1
2
3
4
5
REPLACING A CABLE
AVAILABILITY
• No mission capable
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 5 minutes on average
TOOL(S)
• 1 standard tool box
• 1 clip for nylon cables
• 1 torque wrench for tightening the N connector, torque 500 N.cm
PRODUCT(S) / CONSUMABLE(S)
• Nylon cable ties
PRELIMINARY OPERATION(S)
• To replace an internal rack cable, remove the upper cover (see Plate 6.I, item 1).
REMOVAL
• Identify the cable location and routing (see Plate 6.VII and Plate 6.VIII).
• Locate and cut the nylon cable ties.
SHEET
E-1