INSTALLATION
This chapter describes the installation procedure for the IDR
IDO 3G.
Installation simply involves installing the rack on the site and commissioning it
(see Section 3.3.1).
The resources needed for the installation are just a standard tool case for mounting in a
cabinet.
The installation steps are described in the flowchart in Figure 3.1.
Figure 3.1
IDR IDO 3G INSTALLATION STEPS
Site radio engineering
(contact the
manufacturer's technical
assistance department).
Installation of the
IDR IDO 3G.
Connect the antenna,
earth and power supply
cables (Section 2.3.4.1
If used, connect the
remote alarm cable
(Section 2.3.4.3
Power up the
IDR IDO 3G
(Section 3.3.1.2).
Select the IDR IDO 3G
channel
(Section 3.3.1.3).
Select the transmission
level (Section 3.3.1.4).
Activate transmission
(Section 3.3.1.5).
End of installation
Check the site radio
engineering provisions.
Operational site
(common
installation)
IDR IDO 3G installer