Maintenance
4-55
7
1
2
3
4
5
REPLACING THE 3G PA-TRX MODULE
AVAILABILITY
• No mission capable
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 5 m IDR IDO 3G customisation time (contact the manufacturer's technical
assistance department)
TOOL(S)
• 1 standard tool box
• 1 torque screwdriver for M3 screw, torque 46 N.cm
• 1 torque screwdriver for M3 screw, torque 110 N.cm
• TPS application
PRELIMINARY OPERATION(S)
• Remove the clear protective cover (see Plate 6.I, item 13) by slightly unscrewing the
holding screws, lifting it and taking it out.
SHEET
E-5