5.5.3
Swivel device (optional)
–
Loosen all cables and hoses, connected to the machine head
under the table top.
–
Unscrew the fastening screws of the machine head under the table
top.
–
Screw on the L-bracket 10 for the thread stand on the rear of the
bed plate. Please use the provided screws 1 (2x), washer 2 (4x)
und nuts 3 (2x).
–
Set aside the machine head (Fig. 1)
Note:
Make sure that the oil reservoir is taped up to avoid oil leak.
–
Fix the plastic fittings 4 with the nut 5 on the hinged plate 6.
–
Slide the felt 7 over the fitting 4.
–
Feed all cables and hoses through the fitting 4.
For this purpose, the housing of the plug x120b must be
dismantled.
–
Screw the hinged plate 6 under the bed plate.
For this purpose, screw the threaded pin 8 (4x) on the rubber
feet of the bed plate and secure the hinged plate using the falt
nuts 9 (4x). After tightening the threaded pin, those must be flush
with. They should in any case not be sticking out of the nuts.
–
Feed all cables and hoses through the bore hole in the table top.
–
Set the machine head with the swivel device on the bore holes of
the table top.
–
Connect the cables and the hoses.
–
Screw the thread stand on the L-bracket 10.
–
Arrest the machine head lengthwise or widthwise using the set
screw 11.
12
Fig. 1
Summary of Contents for 540-100-1
Page 1: ...540 100 1 Komplettanleitung Manual complete...
Page 28: ...5 Knopflochprogrammierung 5 1 Knopfloch Aufbau 26...
Page 48: ...Notizen 46...
Page 50: ...8 1 2 11 7 9 10 5 12 4 3 6...
Page 62: ...F r Notizen 14...
Page 108: ...F r Notizen 36...
Page 118: ...Notizen 46...
Page 144: ...5 Buttonhole programming 5 1 Composition of a buttonhole 26...
Page 164: ...Notes 46...
Page 166: ...8 1 2 11 7 9 10 5 12 4 3 6...
Page 178: ...Notes 14...
Page 224: ...Notes 36...