TEST
ACTION
APPLICABILITY
7
Turn the ignition off to the lock position.
Disconnect the PCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
CAUTION: DO NOT PROBE THE PCM HARNESS CONNECTORS. PROBING
THE PCM HARNESS CONNECTORS WILL DAMAGE THE PCM TERMI-
NALS RESULTING IN POOR TERMINAL TO PIN CONNECTION. INSTALL
MILLER SPECIAL TOOL #8815 TO PERFORM DIAGNOSIS.
Measure the resistance between ground and the LR Solenoid Control circuit.
Is the resistance below 5.0 ohms?
All
Yes
→
Repair the LR Solenoid Control circuit for a short to ground.
Perform 41TE (NGC) TRANSMISSION VERIFICATION TEST -
VER 1.
No
→
Go To
8
8
Turn the ignition off to the lock position.
Disconnect the PCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Remove the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Connect a jumper wire between the Fused B+ circuit and the Transmission Control
Relay Output circuit in the Transmission Control Relay connector.
Ignition on, engine not running.
CAUTION: DO NOT PROBE THE PCM HARNESS CONNECTORS. PROBING
THE PCM HARNESS CONNECTORS WILL DAMAGE THE PCM TERMI-
NALS RESULTING IN POOR TERMINAL TO PIN CONNECTION. INSTALL
MILLER SPECIAL TOOL #8815 TO PERFORM DIAGNOSIS.
Measure the voltage of the LR Solenoid Control circuit.
Is the voltage above 0.5 volts?
All
Yes
→
Repair the LR Solenoid Control circuit for a short to voltage.
Perform 41TE (NGC) TRANSMISSION VERIFICATION TEST -
VER 1.
No
→
Go To
9
9
Turn the ignition off to the lock position.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Remove the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Connect a jumper wire between the Fused B+ circuit and Transmission Control Relay
Output circuit in the Transmission Control Relay connector.
Using a 12-volt test light connected to ground, check the Transmission Relay Output
circuit in the Transmission Solenoid/Pressure Switch harness connector.
NOTE: The test light must illuminate brightly. Compare the brightness to
that of a direct connection to the battery.
Does the test light illuminate brightly?
All
Yes
→
Go To
10
No
→
Repair the Transmission Control Relay Output circuit for an
open. If the fuse is open make sure to check for a short to ground.
Perform 41TE (NGC) TRANSMISSION VERIFICATION TEST -
VER 1.
89
TRANSMISSION - NGC
P0750-LR SOLENOID CIRCUIT —
Continued
Summary of Contents for 2004 Neon SRT4
Page 22: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 15...
Page 252: ...8 7 4 DECKLID SECURITY SWITCH C O M P O N E N T L O C A T I O N S 245 COMPONENT LOCATIONS...
Page 272: ...10 2 AUDIO SYSTEM S C H E M A T I C D I A G R A M S 266 SCHEMATIC DIAGRAMS...
Page 274: ...10 4 EXTERIOR LIGHTING S C H E M A T I C D I A G R A M S 268 SCHEMATIC DIAGRAMS...
Page 275: ...10 5 INSTRUMENT CLUSTER S C H E M A T I C D I A G R A M S 269 SCHEMATIC DIAGRAMS...
Page 277: ...10 8 VEHICLE COMMUNICATION S C H E M A T I C D I A G R A M S 271 SCHEMATIC DIAGRAMS...
Page 278: ...10 9 VEHICLE THEFT SECURITY SYSTEM S C H E M A T I C D I A G R A M S 272 SCHEMATIC DIAGRAMS...
Page 280: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 290: ...NOTES 8...
Page 291: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 9...
Page 330: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 344: ...FIGURE 1 8 GENERAL INFORMATION...
Page 345: ...FIGURE 2 9 GENERAL INFORMATION...
Page 353: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 17...
Page 692: ...C O N N E C T O R P I N O U T S 357 CONNECTOR PINOUTS...
Page 694: ...C O N N E C T O R P I N O U T S 359 CONNECTOR PINOUTS...
Page 700: ...C O N N E C T O R P I N O U T S 365 CONNECTOR PINOUTS...
Page 710: ...S C H E M A T I C D I A G R A M S 376 SCHEMATIC DIAGRAMS 10 1 2004 PL 2 0L ENGINE Continued...
Page 711: ...10 2 2004 SRT 4 2 4L ENGINE S C H E M A T I C D I A G R A M S 377 SCHEMATIC DIAGRAMS...
Page 712: ...S C H E M A T I C D I A G R A M S 378 SCHEMATIC DIAGRAMS 10 2 2004 SRT 4 2 4L ENGINE Continued...
Page 713: ...11 0 CHARTS AND GRAPHS C H A R T S A N D G R A P H S 379 CHARTS AND GRAPHS...
Page 714: ...C H A R T S A N D G R A P H S 380 CHARTS AND GRAPHS...
Page 715: ...C H A R T S A N D G R A P H S 381 CHARTS AND GRAPHS...
Page 717: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 745: ...NOTES 24...
Page 746: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 25...
Page 904: ...C O N N E C T O R P I N O U T S 184 CONNECTOR PINOUTS...
Page 906: ...C O N N E C T O R P I N O U T S 186 CONNECTOR PINOUTS...
Page 909: ...C O N N E C T O R P I N O U T S 189 CONNECTOR PINOUTS...
Page 917: ...10 0 SCHEMATIC DIAGRAMS S C H E M A T I C D I A G R A M S 197 SCHEMATIC DIAGRAMS...
Page 920: ...11 5 TRANSMISSION TEMPERATURE SENSOR C H A R T S A N D G R A P H S 201 CHARTS AND GRAPHS...
Page 922: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...