TEST
ACTION
APPLICABILITY
4
Note: Ensure there is PCI Bus communication with other modules on the
vehicle before proceeding. If not, refer to the symptom list from the menu
and repair as necessary.
Disconnect the CAB harness connector.
Use Scope input cable CH7058, Cable to Probe adapter CH7062, and the red and
black test probes.
Connect the scope input cable to the channel one connector on the DRB. Attach the
red and black leads and the cable to probe adapter to the scope input cable.
With the DRBIII
t
select Pep Module Tools.
Select lab scope.
Select Live Data.
Select 12 volt square wave.
Press F2 for Scope.
Press F2 and use the down arrow to set voltage range to 20 volts. Press F2 again
when complete.
Connect the Black lead to the chassis ground. Connect the Red lead to the PCI Bus
circuit in the CAB connector.
Turn the ignition on.
Observe the voltage display on the DRB Lab Scope.
Does the voltage pulse from 0 to approximately 7.5 volts?
All
Yes
→
Go To
5
No
→
Repair the PCI Bus circuit for an open.
Perform ABS VERIFICATION TEST - VER 1.
5
If there are no possible causes remaining, view repair.
All
Repair
Replace the Controller Antilock Brake in accordance with the
Service Information.
Perform ABS VERIFICATION TEST - VER 1.
37
COMMUNICATION
*NO RESPONSE FROM CONTROLLER ANTILOCK BRAKE —
Continued
Summary of Contents for 2004 Neon SRT4
Page 22: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 15...
Page 252: ...8 7 4 DECKLID SECURITY SWITCH C O M P O N E N T L O C A T I O N S 245 COMPONENT LOCATIONS...
Page 272: ...10 2 AUDIO SYSTEM S C H E M A T I C D I A G R A M S 266 SCHEMATIC DIAGRAMS...
Page 274: ...10 4 EXTERIOR LIGHTING S C H E M A T I C D I A G R A M S 268 SCHEMATIC DIAGRAMS...
Page 275: ...10 5 INSTRUMENT CLUSTER S C H E M A T I C D I A G R A M S 269 SCHEMATIC DIAGRAMS...
Page 277: ...10 8 VEHICLE COMMUNICATION S C H E M A T I C D I A G R A M S 271 SCHEMATIC DIAGRAMS...
Page 278: ...10 9 VEHICLE THEFT SECURITY SYSTEM S C H E M A T I C D I A G R A M S 272 SCHEMATIC DIAGRAMS...
Page 280: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 290: ...NOTES 8...
Page 291: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 9...
Page 330: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 344: ...FIGURE 1 8 GENERAL INFORMATION...
Page 345: ...FIGURE 2 9 GENERAL INFORMATION...
Page 353: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 17...
Page 692: ...C O N N E C T O R P I N O U T S 357 CONNECTOR PINOUTS...
Page 694: ...C O N N E C T O R P I N O U T S 359 CONNECTOR PINOUTS...
Page 700: ...C O N N E C T O R P I N O U T S 365 CONNECTOR PINOUTS...
Page 710: ...S C H E M A T I C D I A G R A M S 376 SCHEMATIC DIAGRAMS 10 1 2004 PL 2 0L ENGINE Continued...
Page 711: ...10 2 2004 SRT 4 2 4L ENGINE S C H E M A T I C D I A G R A M S 377 SCHEMATIC DIAGRAMS...
Page 712: ...S C H E M A T I C D I A G R A M S 378 SCHEMATIC DIAGRAMS 10 2 2004 SRT 4 2 4L ENGINE Continued...
Page 713: ...11 0 CHARTS AND GRAPHS C H A R T S A N D G R A P H S 379 CHARTS AND GRAPHS...
Page 714: ...C H A R T S A N D G R A P H S 380 CHARTS AND GRAPHS...
Page 715: ...C H A R T S A N D G R A P H S 381 CHARTS AND GRAPHS...
Page 717: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 745: ...NOTES 24...
Page 746: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 25...
Page 904: ...C O N N E C T O R P I N O U T S 184 CONNECTOR PINOUTS...
Page 906: ...C O N N E C T O R P I N O U T S 186 CONNECTOR PINOUTS...
Page 909: ...C O N N E C T O R P I N O U T S 189 CONNECTOR PINOUTS...
Page 917: ...10 0 SCHEMATIC DIAGRAMS S C H E M A T I C D I A G R A M S 197 SCHEMATIC DIAGRAMS...
Page 920: ...11 5 TRANSMISSION TEMPERATURE SENSOR C H A R T S A N D G R A P H S 201 CHARTS AND GRAPHS...
Page 922: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...