TEST
ACTION
APPLICABILITY
2
With the DRBIII
t
, read and record Freeze Frame Data specific to the CKP signal,
ECT, RPM, Sync state, vehicle speed, etc.
Turn the ignition off.
With the DRBIII
t
lab scope probe and the Miller special tool #6801, backprobe the
(K24) CKP Signal circuit at the Sensor harness connector.
WARNING: WHEN THE ENGINE IS OPERATING, DO NOT STAND IN A
DIRECT LINE WITH THE FAN. DO NOT PUT YOUR HANDS NEAR THE
PULLEYS, BELTS OR FAN. DO NOT WEAR LOOSE CLOTHING.
Ignition on, engine not running.
Observe the lab scope screen at least 1 minute and then start the vehicle.
Continue observing the lab scope screen for an additional minute.
Were there any irregular or missing signals?
All
Yes
→
Go To
3
No
→
Go To
8
3
Visually inspect the related wire harness including the ground circuit. Look for any
chafed, pierced, pinched, or partially broken wires.
Visually inspect the related wire harness connectors. Look for broken, bent, pushed
out, or corroded terminals.
Ensure the Crankshaft Position Sensor and the Camshaft Position Sensor are
properly installed and the mounting bolt(s) are tight.
Refer to any TSBs that may apply.
Were any of the above conditions present?
All
Yes
→
Repair as necessary
Perform POWERTRAIN VERIFICATION TEST VER - 5 - NGC.
No
→
Go To
4
4
Turn the ignition off.
Disconnect the CKP Sensor connector.
Ignition on, engine not running.
Measure the voltage on the (K7) 5 Volt Supply circuit.
Is the voltage between 4.5 and 5.5 volts?
All
Yes
→
Go To
5
No
→
Repair the open or short to ground in the (K7) 5 Volt Supply
circuit. Use Miller special tool #8815 when checking for an open
circuit to prevent PCM harness connector terminal damage.
Perform POWERTRAIN VERIFICATION TEST VER - 5 - NGC.
5
Turn the ignition off.
Carefully disconnect the Battery (-) Ground cable.
Remove the Crankshaft Position Sensor.
Inspect the Tone Wheel/Flex Plate slots for damage, foreign material, or excessive
movement.
Were any problems found?
All
Yes
→
Repair or replace the Tone Wheel/Flex Plate as necessary.
Perform POWERTRAIN VERIFICATION TEST VER - 5 - NGC.
No
→
Go To
6
141
DRIVEABILITY - NGC
P0339-CRANKSHAFT POSITION SENSOR INTERMITTENT —
Continued
Summary of Contents for 2004 Neon SRT4
Page 22: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 15...
Page 252: ...8 7 4 DECKLID SECURITY SWITCH C O M P O N E N T L O C A T I O N S 245 COMPONENT LOCATIONS...
Page 272: ...10 2 AUDIO SYSTEM S C H E M A T I C D I A G R A M S 266 SCHEMATIC DIAGRAMS...
Page 274: ...10 4 EXTERIOR LIGHTING S C H E M A T I C D I A G R A M S 268 SCHEMATIC DIAGRAMS...
Page 275: ...10 5 INSTRUMENT CLUSTER S C H E M A T I C D I A G R A M S 269 SCHEMATIC DIAGRAMS...
Page 277: ...10 8 VEHICLE COMMUNICATION S C H E M A T I C D I A G R A M S 271 SCHEMATIC DIAGRAMS...
Page 278: ...10 9 VEHICLE THEFT SECURITY SYSTEM S C H E M A T I C D I A G R A M S 272 SCHEMATIC DIAGRAMS...
Page 280: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 290: ...NOTES 8...
Page 291: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 9...
Page 330: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 344: ...FIGURE 1 8 GENERAL INFORMATION...
Page 345: ...FIGURE 2 9 GENERAL INFORMATION...
Page 353: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 17...
Page 692: ...C O N N E C T O R P I N O U T S 357 CONNECTOR PINOUTS...
Page 694: ...C O N N E C T O R P I N O U T S 359 CONNECTOR PINOUTS...
Page 700: ...C O N N E C T O R P I N O U T S 365 CONNECTOR PINOUTS...
Page 710: ...S C H E M A T I C D I A G R A M S 376 SCHEMATIC DIAGRAMS 10 1 2004 PL 2 0L ENGINE Continued...
Page 711: ...10 2 2004 SRT 4 2 4L ENGINE S C H E M A T I C D I A G R A M S 377 SCHEMATIC DIAGRAMS...
Page 712: ...S C H E M A T I C D I A G R A M S 378 SCHEMATIC DIAGRAMS 10 2 2004 SRT 4 2 4L ENGINE Continued...
Page 713: ...11 0 CHARTS AND GRAPHS C H A R T S A N D G R A P H S 379 CHARTS AND GRAPHS...
Page 714: ...C H A R T S A N D G R A P H S 380 CHARTS AND GRAPHS...
Page 715: ...C H A R T S A N D G R A P H S 381 CHARTS AND GRAPHS...
Page 717: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...
Page 745: ...NOTES 24...
Page 746: ...7 0 DIAGNOSTIC INFORMATION AND PROCEDURES 25...
Page 904: ...C O N N E C T O R P I N O U T S 184 CONNECTOR PINOUTS...
Page 906: ...C O N N E C T O R P I N O U T S 186 CONNECTOR PINOUTS...
Page 909: ...C O N N E C T O R P I N O U T S 189 CONNECTOR PINOUTS...
Page 917: ...10 0 SCHEMATIC DIAGRAMS S C H E M A T I C D I A G R A M S 197 SCHEMATIC DIAGRAMS...
Page 920: ...11 5 TRANSMISSION TEMPERATURE SENSOR C H A R T S A N D G R A P H S 201 CHARTS AND GRAPHS...
Page 922: ...Dealer Technical Operations 800 Chrysler Drive CIMS 486 02 76 Auburn Hills MI 48326 2757...