3-8 ChannelWorks Network Installer’s Guide
10. Press the Spacebar twice, within 10 seconds after the ChannelWorks Bridge
power-on diagnostics passes the ASIC Interrupt and Loopback Test and displays
three periods in the left margin.
This action prevents the ChannelWorks Bridge from performing its application
boot at the end of its power up process. Approximately 30 seconds after you press
the Spacebar, the ChannelWorks Bridge lists its memory sizes and displays its
PROM monitor prompt of two greater than signs (>>). This allows access to the
Channelworks Bridge NVRAM.
11. Close the terminal emulator application.
This releases the PC’s serial port for use by other programs such as the LCS. Use
the LCS application to perform the remaining procedures in this chapter.
Figure 3-5
ChannelWorks Bridge Power On Diagnostics
Interrupt power-on sequence at this point by
pressing the Spacebar twice within 10 seconds.
LANcity Monitor: V2.0
Summary of Contents for ChannelWorks
Page 1: ...ChannelWorks Part Number EK DECTV IN B01 Network Installer s Guide...
Page 10: ...x...
Page 20: ...xx ChannelWorks Network Installer s Guide...
Page 32: ...2 10 ChannelWorks Network Installer s Guide...
Page 50: ...3 18 ChannelWorks Network Installer s Guide...
Page 62: ...4 12 ChannelWorks Network Installer s Guide...
Page 66: ...5 4 ChannelWorks Network Installer s Guide...
Page 70: ...A 4 ChannelWorks Network Installer s Guide...
Page 72: ...B 2 ChannelWorks Network Installer s Guide...
Page 82: ...B 12 ChannelWorks Network Installer s Guide...
Page 86: ...4 ChannelWorks Network Installer s Guide...
Page 89: ......
Page 90: ...Printed in U S A...