DHS Systems, LLC
TM 95236-00
0001
0001-3
No rights are conveyed except as indicated in the legend on the cover of this document.
PREPARATION FOR STORAGE OR SHIPMENT
Place items in administrative storage for short periods of time when a shortage of maintenance resources exist. It
should be possible to place items in a state of mission readiness either within 24 hours or within the time frame
that the directing authority may determine. Keep appropriate maintenance records during storage.
Prior to placing the equipment in administrative storage, Army activities perform Preventative Maintenance
Checks and Services (PMCS), complete Equipment Serviceability Criteria (ESC) evaluations, correct
shortcomings and deficiencies, and complete all Modification Work Orders (MWO). When removing Items from
administrative storage, the operator performs PMCS to ensure operational readiness.
Inside storage is preferred for items selected for administrative storage. If inside storage is not available, use
trucks, vans, or other containers
WARRANTY INFORMATION
The AVCS has a limited 1 year warranty, with the following exceptions
•
Deployable Command & Control Equipment (AVCS) Cables: 30 days
•
Deployable Command & Control Equipment (AVCS) Lamps and Bulbs: 500 Hours/ 90 Days
•
Deployable Command & Control Equipment (AVCS) Touch Panels: 90 Days
The warranty starts on the date found in block 23 of DA Form 2408-9, Equipment Control Record. If no DA 2408-
9 is available, the date will be the recorded date of shipment of the equipment from the factory. Report all defects
to the supervisor, who takes appropriate action.
NOMENCLATURE CROSS-REFERENCE LIST
Common names and/or abbreviations are used in the manual to make a procedure easier to read. Table 1
matches the official nomenclatures with the common names
Table 1. Nomenclature Cross-Reference List.
OFFICIAL NOMENCLATURE
COMMON NAME (PART NUMBER)
Bayonet Neill-Concelman Connector
BNC Connector
HD-15 Connector
VGA Connector RGBHV
Digital Command and Control Equipment
AVCS
Command Post
CP
Preventive Maintenance Checks and Services
PMCS
Summary of Contents for TM 95263 00
Page 2: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 22: ......
Page 28: ......
Page 30: ......
Page 31: ...DHS Systems LLC TM 95236 00 CHAPTER 2 OPERATOR INSTRUCTIONS FOR AVCS MINI...
Page 32: ......
Page 48: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 91: ...DHS Systems LLC TM 95236 00 CHAPTER 3 OPERATOR TROUBLESHOOTING PROCEDURES FOR AVCS MINI...
Page 92: ......
Page 100: ......
Page 106: ......
Page 107: ...DHS Systems LLC TM 95236 00 CHAPTER 4 OPERATOR MAINTENANCE INSTRUCTIONS FOR AVCS MINI...
Page 108: ......
Page 112: ......
Page 116: ......
Page 122: ......
Page 123: ...DHS Systems LLC TM 95236 00 CHAPTER 5 SUPPORTING INFORMATION FOR AVCS MINI...
Page 124: ......
Page 130: ......
Page 132: ......