Field Setting
ESiEN09-06 A
144
Test Operation
3.2.6 Check Operation Detail
Unit stopping
Press the TEST button for 5 seconds.
10 sec to 10 minutes
LED display (H1P~H7P) (
:
ON
:
OFF
:
BLINK)
Pressure equalizing
Step 1
20 sec to 2 minutes
10 minutes
5 minutes
Cooling start control
Step 2
Stability waiting operation
Step 3
Pump down residual operation
Step 9
5 minutes
Standby for restarting
Completion
Step 10
Stop valve close check
Wrong wiring check
Correct Refrigerant charge check
Piping length check
Judgement function
Step4~8
CHECK OPERATION FUNCTION
(Press the MODE button BS1 once and set to SETTING MODE 1 (H1P: OFF))
Summary of Contents for ERQ Series
Page 2: ......
Page 16: ...Combination Table ESiEN09 06 A 6 General Information...
Page 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Page 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Page 58: ...Outline of Control ESiEN09 06 A 48 Function...
Page 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Page 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...