Special Control
ESiEN09-06 A
30
Function
3.2
Oil Return Operation
In order to prevent the compressor from running out of oil, the oil return operation is conducted to recover oil flown out
from the compressor to the system side.
3.2.1 Oil Return Operation in Cooling Operation
[Start conditions]
Referring to the set conditions for the following items, start the oil return operation in cooling.
• Cumulative oil feed rate
• Timer setting (Make this setting so as to start the oil return operation when the initial cumulative operating time
reaches two hours after power supply is turned ON and then every eight hours.)
Furthermore, the cumulative oil feed rate is computed from Tc, Te, and compressor loads.
Outdoor unit actuator
Oil return preparation
operation
Oil return operation
Post-oil-return operation
Compressor
Take the current step as the
upper limit.
5 HP: 52 Hz
( Low pressure constant
control)
Other model:
52 Hz + ON + ON
( Low pressure
constant control)
Maintain number of
compressors in oil
return preparation
operation ON
Same as the
“
oil return
operation
”
mode.
Outdoor unit fan
Fan control (Normal cooling) Fan control (Normal cooling) Fan control (Normal cooling)
Four way valve
OFF
OFF
OFF
Main motorized valve (EV1)
480 pls
480 pls
480 pls
Subcooling motorized valve (EV2)
SH control
0 pls
0 pls
Hot gas bypass valve (SVP)
OFF
OFF
OFF
Accumulator oil return valve (SVO)
ON
ON
ON
Ending conditions
20 sec.
3 min.
Ts - Te<5 C
3 min.
Pe<0.6MPa
HTdi>110 C
or
or
AHU actuator
Cooling oil return operation
Fan
Thermostat ON unit
ON
Stopping unit
OFF
Summary of Contents for ERQ Series
Page 2: ......
Page 16: ...Combination Table ESiEN09 06 A 6 General Information...
Page 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Page 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Page 58: ...Outline of Control ESiEN09 06 A 48 Function...
Page 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Page 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...