Field Setting
ESiEN09-06 A
126
Test Operation
“Detail of DS1-1~4, DS2-1~4 setting” (for Overseas general)
Unit
Setting method ( represents the position of switches)
HEAT PUMP(5HP)
ERQ 125
Set DS2-1 to ON.
HEAT PUMP(8HP)
ERQ 200
Set DS2-1 and DS2-3 to ON.
HEAT PUMP(10HP)
ERQ 250
Set DS2-1, DS2-2 and DS2-3
to ON.