ESiEN09-06 A
Test Operation
Test Operation
111
1.2.6.3
Checks after Test Run
Perform the following checks after the test run is complete.
• Record the contents of field setting.
Record them on the accessory “REQUEST FOR THE INDICATION” label.
And attach the label on the back side of the front panel.
• Record the installation date.
Record the installation date on the accessory “REQUEST FOR THE INDICATION” label in
accordance with the IEC60335-2-40.
And attach the label on the back side of the front panel.
NOTE:
After the test run, when handing the unit over to the customer, make sure the EL.COMPO.BOX
lid, the inspection door, and the unit casing are all attached.
Summary of Contents for ERQ Series
Page 2: ......
Page 16: ...Combination Table ESiEN09 06 A 6 General Information...
Page 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Page 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Page 58: ...Outline of Control ESiEN09 06 A 48 Function...
Page 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Page 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...