Field Setting
ESiEN09-06 A
140
Test Operation
Image of operation in the case of A
Image of operation in the case of B
Image of operation in the case of A and B
(V3081)
Power consumption
Rated power consumption
80 % of rated power consumption
70 % of rated power consumption
60 % of rated power consumption
40 % of rated power consumption
Forced thermostat OFF
(Fan operation)
Demand level 1 instructing
Power consumption set by
"Demand 1 level setting".
Demand level 2 instructing Demand level 3 instructing
The power
consumption during
the demand level 1
instructing can be
set with the
"Demand 1 level
setting".
("70 % of rated
power consumption"
has been set at
factory.)
(V3082)
The power consumption set with "Demand 1 level setting".
When the "Normal
demand setting" is
set to ON ("OFF"
has been set at
factory.) , the power
consumption can be
set with the
"Demand 1 level
setting". ("70 % of
rated power
consumption" has
been set at factory.)
Power consumption
Rated power consumption
80 % of rated power consumption
70 % of rated power consumption
60 % of rated power consumption
(V3083)
The power consumption set with "Demand 1 level setting".
Demand level 2 instructing Demand level 3 instructing
The power
consumption can be
set with the
"Demand 1 level
setting". ("70 % of
rated power
consumption" has
been set at factory.)
During continuous demand operation,
when the external demand instruction is
received repeatedly, the instruction with
higher demand level has the precedence.
Power consumption
Rated power consumption
80 % of rated power consumption
70 % of rated power consumption
60 % of rated power consumption
40 % of rated power consumption
Forced thermostat OFF
(Fan operation)
Summary of Contents for ERQ Series
Page 2: ......
Page 16: ...Combination Table ESiEN09 06 A 6 General Information...
Page 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Page 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Page 58: ...Outline of Control ESiEN09 06 A 48 Function...
Page 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Page 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...