![background image](http://html.mh-extra.com/html/daikin/2amx40g2v1b/2amx40g2v1b_service-manual_501057245.webp)
SiBE12-933_A
Outdoor Unit
Removal Procedure
235
7
Remove the 7 screws in
total to remove the
PCB.
8
Lift up the back side
slightly and undo the
hooks of the front.
Make sure that the hooks of
the electrical box are placed
on the PCB.
9
Undo the lead wires
from the hook and
remove the terminal
board on the side.
Step
Procedure
Points
(R7598)
(R7602)
(R7603)
(R7604)
Terminal board