Pilot's Operating Handbook
Section 7
Description
Edition 0 - March 05, 2019
Rev. 1
Page 7.12.2
Dynamic pressure system
One heated pitot probe is installed under the L.H. wing. The second one is installed
under the R.H. wing. The first one supplies the standby attitude module and one ADC.
The second one supplies the other ADC.
Both lines incorporate a drain plug located in the root of L.H. and R.H. wings.
Pitot heating
Pitot heating is controlled by PITOT L HTR and PITOT R & STALL HTR switches,
installed on DE-ICE SYSTEM panel. Refer to chapter 7.13 for further details.
▲
CAUTION
▲
Do not use heating during prolonged periods on ground to avoid pitot
overheat.
▲
PIM - DO NOT USE FOR FLIGHT OPERATIONS