
6
5
The lift must be placed on level floor and sufficiently resistant. The surface and foundation must be
suitable for bearing maximum stress values, also in unfavorable working conditions. If in-
ground/recessed installation is made (PSB 3A model only), the finished size of the hole must be
verified (as per drawing sent at the time of order). For installations on raised surface, compliance
with the maximum carrying capacity of the surface is recommended..
7.4
RUNWAY ASSEMBLY AND CONTROL DESK POSITIONING
Unauthorized persons are not allowed to enter during assembly..
Transport platforms to the installation site by using hoisting means with load capacity of
500 kg
at
least
To prevent the platform from dropping during transport, it should be lifted according to its centre of
gravity.
Always raise platforms by holding them on the underside of the base frames
Position the base frames on the foundation according to the drive-on direction of the lift
Lift platforms with auxiliary equipment by using strong ropes, bands and chains and insert the
safety blocks supplied with the lift.
Place the control desk in the position provided for.
7.5
HYDRAULIC SYSTEM CONNECTION
(Rif. Fig. 16)
Connect hydraulic hose to the fittings placed on the fixed platforms referring to the letters
shown on them.
Tighten thoroughly.
Connect hydraulic hoses to the fittings placed on the hydraulic unit referring to the letters
shown on them.
Tighten thoroughly
7.3
INSTALLATION SURFACE OR INSTALLATION HOLE
Summary of Contents for ERCO 500
Page 14: ...14 Figura 4 LAYOUT PSS MONOFORBICE ESTENSIONE...
Page 15: ...15 Figura 4a LAYOUT PSS MONOFORBICE CON FLAP...
Page 16: ...16 Figura 4b LAYOUT PSS MONOFORBICE ESTENSIONE CON OPERA CIVILE...
Page 17: ...17 Figura 4c LAYOUT PSS MONOFORBICE CON FLAP CON OPERA CIVILE...
Page 21: ...21 Figura 7 SCHEMA ELETTRICO...
Page 29: ...29 Figura 16 COLLEGAMENTO TUBI IDRAULICI A B F...
Page 51: ...51 Figura 4 LAYOUT PSS MONOFORBICE WITH ESTENSION...
Page 52: ...52 Figura 4a LAYOUT PSS MONOFORBICE WITH FLAP...
Page 53: ...53 Figura 4b LAYOUT PSS MONOFORBICE ESTENSION WITH FRAME...
Page 54: ...54 Figura 4c LAYOUT PSS MONOFORBICE FLAP WITH FRAME...
Page 58: ...58 Figure 7 ELECTRICAL DIAGRAM...
Page 66: ...66 Figure 16 HIDRAULIC HOSE CONECTION A B F...
Page 87: ...Figura 4 PLAN D ENSEMBLE F...
Page 88: ...Figura 4a PLAN D ENSEMBLE F...
Page 89: ...Figura 4b PLAN D ENSEMBLE F...
Page 90: ...Figura 4c PLAN D ENSEMBLE F...
Page 94: ...F Figura 7 SCHEMA ELECTRIQUE...
Page 102: ...F Figure 16 RACCORDEMENT DES TUYAUX HYDRAULIQUES A B F...
Page 124: ...124 Bild 4 LAYOUT...
Page 125: ...125 Bild 4a LAYOUT...
Page 126: ...126 Bild 4b LAYOUT...
Page 127: ...127 Bild 4c LAYOUT...
Page 131: ...131 Bild 7 ELEKTROSCHALTPLAN...
Page 139: ...139 Bild 16 ANSCHLIESSEN DER HYDRAULIKLEITUNGEN A B F...
Page 161: ...Figura 4a DISE O DESARROLLADO...
Page 162: ...Figura 4b DISE O DESARROLLADO...
Page 163: ...Figura 4c DISE O DESARROLLADO...
Page 167: ...Figura 7 ESQUEMA EL CTRICO...
Page 175: ...Figura 16 CONEXI N DE LOS TUBOS HIDR ULICOS A B F...