3 CHAPTER 3 - PACKING, TRANSPORT AND STORAGE
Only skilled personnel who are familiar with the lift and this manual shall be allowed to carry out
packing, lifting, handling, transport and unpacking operations.
3.1
PACKING
The lift is delivered in many components that appears sub-assembled.
The lay-out is referred to the model.
The
model on-floor installation
:
No. 2 base units, each one with a platform and hydraulic cylinders
No. 1 control box equipped with hydraulic unit
No. 1 box containing hydraulic lines, connecting cables, four rubber blocks, stickers and
technical documentation
No. 4 drive-on ramps (2 front and 2 rear ramps) equipped with protective devices to
connect platforms
The model in-ground installation
:
No. 2 base units, each one with a platform and hydraulic cylinders
No. 1 control box equipped with hydraulic unit
No. 1 box containing hydraulic lines, connection cables, four rubber brackets, 40 mm high,
stickers and technical documentation
No. 2 holes covers
If requested, optional accessories are available to satisfy each customer’s requirements (Ref.
accessories manual and price lists).
The lift is packed in a single box on a wooden bed, wrapped up in non-scratch waterproof material
and sealed with 2 straps.
The average of the package is
520 kg
3.2
LIFTING AND HANDLING
When loading/unloading or transporting the equipment to the site, be sure to use suitable loading
(e.g. cranes, trucks) and hoisting means. Be sure also to hoist and transport the components
securely so that they cannot drop, taking into consideration the package’s size, weight and centre
of gravity and it’s fragile parts.
Figure 1 – PACKAGE AND HANDLING
Hoist and handle only one package at a time
Summary of Contents for ERCO 500
Page 14: ...14 Figura 4 LAYOUT PSS MONOFORBICE ESTENSIONE...
Page 15: ...15 Figura 4a LAYOUT PSS MONOFORBICE CON FLAP...
Page 16: ...16 Figura 4b LAYOUT PSS MONOFORBICE ESTENSIONE CON OPERA CIVILE...
Page 17: ...17 Figura 4c LAYOUT PSS MONOFORBICE CON FLAP CON OPERA CIVILE...
Page 21: ...21 Figura 7 SCHEMA ELETTRICO...
Page 29: ...29 Figura 16 COLLEGAMENTO TUBI IDRAULICI A B F...
Page 51: ...51 Figura 4 LAYOUT PSS MONOFORBICE WITH ESTENSION...
Page 52: ...52 Figura 4a LAYOUT PSS MONOFORBICE WITH FLAP...
Page 53: ...53 Figura 4b LAYOUT PSS MONOFORBICE ESTENSION WITH FRAME...
Page 54: ...54 Figura 4c LAYOUT PSS MONOFORBICE FLAP WITH FRAME...
Page 58: ...58 Figure 7 ELECTRICAL DIAGRAM...
Page 66: ...66 Figure 16 HIDRAULIC HOSE CONECTION A B F...
Page 87: ...Figura 4 PLAN D ENSEMBLE F...
Page 88: ...Figura 4a PLAN D ENSEMBLE F...
Page 89: ...Figura 4b PLAN D ENSEMBLE F...
Page 90: ...Figura 4c PLAN D ENSEMBLE F...
Page 94: ...F Figura 7 SCHEMA ELECTRIQUE...
Page 102: ...F Figure 16 RACCORDEMENT DES TUYAUX HYDRAULIQUES A B F...
Page 124: ...124 Bild 4 LAYOUT...
Page 125: ...125 Bild 4a LAYOUT...
Page 126: ...126 Bild 4b LAYOUT...
Page 127: ...127 Bild 4c LAYOUT...
Page 131: ...131 Bild 7 ELEKTROSCHALTPLAN...
Page 139: ...139 Bild 16 ANSCHLIESSEN DER HYDRAULIKLEITUNGEN A B F...
Page 161: ...Figura 4a DISE O DESARROLLADO...
Page 162: ...Figura 4b DISE O DESARROLLADO...
Page 163: ...Figura 4c DISE O DESARROLLADO...
Page 167: ...Figura 7 ESQUEMA EL CTRICO...
Page 175: ...Figura 16 CONEXI N DE LOS TUBOS HIDR ULICOS A B F...