the internal cooling fan start-up. NOTE: There is no other indication of “ballast ON”
status.
Figure 2.2. Ballast Connection and Power-up
HEAD-TO-AC:
Connect the Christie-
supplied IEC 320 (220V) 15-amp
line cord to your AC supply. Do not
substitute other cords. Input power
required is 200 - 240 VAC
(nominal), 50 to 60 Hz @ 3 amps
for 208 V.
WARNING
Do not attempt operation if the
AC level is not within the
specified voltage and power
range for the projection head.
EXTRACTOR:
Also plug the
extractor fan into the projector. See
2.4, Installing a Lens, Lamp, &
Cooling
At this point, the projection head is
in a type of “standby” mode only—the voltmeter should both display the incoming
voltage and the adjacent main
PROJ.
STATUS
light should be yellow, and light engine
compartment fans are running but the rest of the projection head is off.
Set Lamp Type
WARNING
Explosion hazard. Keep the projection head
OFF
until
you have defined which lamp type is installed.
STEP
5
'
Summary of Contents for Roadie 25K
Page 6: ......
Page 56: ......
Page 153: ...SPECIFICATIONS Roadie 25K User s Manual 6 7 ...
Page 164: ......
Page 165: ...Appendix B Remote Keypad Roadie 25K User s Manual B 1 Figure B 1 Standard Remote Keypad ...
Page 166: ......
Page 168: ...SERIAL COMMUNICATION CABLES C 2 Roadie 25K User s Manual ...
Page 169: ...SERIAL COMMUNICATION CABLES Roadie 25K User s Manual C 3 ...
Page 170: ......
Page 186: ......