Highway Class Paver/Finishers
Drive Train
A-58
D
RIVE
A
XLE
A
ND
B
RAKE
A
SSEMBLY
(All Machines Except PF-510)
This procedure covers:
✓
Removal
Inspection/Specification
✓
Installation
Disassembly
Assembly
✓
Adjustments
Special Cleaning
Component Test
✓
Equipment Preparation
Machine Set-up
Special Tools
Fabricated Tools
• Drive chains disconnected.
✓
None
✓
None
• Battery disconnected.
• Machine blocked to prevent movement.
• Catch container for brake fluid (3 qts., 3 L).