Drive Train
Highway Class Paver/Finishers
A-115
ASSEMBLY
Step 1:
Press tire on rim until flush with edge of rim.
NOTE
When pressing take-up tire onto rim, access to
a 100 ton press is needed.
Step 2:
Insert bearing cup and press into place.
Step 3:
Install track tension cylinder.
a. Lift track up to give adequate work space.
b. Install track tension cylinder (2) through frame
mounting bracket and against take-up wheel
shaft.
c. Align barrel pin bore and install cylinder mount-
ing pin (4).
d. Tighten set screw (3) to hold cylinder pin in
place.
e. Connect hose (1) to track tension cylinder.
f. Tighten bleeder screw (5).
5
4
2
1
3
0718-40B
INSTALLATION
Step 1:
Install take-up wheel.
a. Lift track up to give adequate work space.
b. Place tire on shaft.
c. Install nut and lockwasher. Rotate wheel
backward as you tighten to seat bearings.
d. Install cover, install lug nuts.
0718-50
ADJUSTMENT
Step 1:
Adjust take-up wheel position.
a. Loosen bleeder screw (1).
b. Disengage clutch.
c. Start engine.
d. Intermittently engage clutch until no air bubbles
appear.
BK-39
1
Step 2:
Check track operation.
a. Drive the machine in reverse for one full track
revolution.
b. Drive machine in forward for two full track
revolutions.
c. Verify proper track tension by sight.