Highway Class Paver/Finishers
Drive Train
A-14
E
NGINE
A
SSEMBLY
This procedure covers:
✓
Removal
Inspection/Specification
✓
Installation
Disassembly
Assembly
✓
Adjustments
Special Cleaning
Component Test
✓
Equipment Preparation
Machine Set-up
Special Tools
Fabricated Tools
• Engine housing removed.
✓
None
✓
None
• Battery disconnected.
• Air cleaner assembly removed.
• Machine blocked to prevent movement.
• Catch container for oil (5 gal., 20 L).
• Catch container for coolant (10 gal., 40 L).
• Throttle cylinder removed.