Highway Class Paver/Finishers
Drive Train
A-46
Step 4:
Apply surface sealant to washer (7) and Loctite to
capscrew (8). Assemble yoke (9) to input shaft (10).
BK-22
8
7
9
10
INSTALLATION
Install the pump drive transmission by reversing
removal procedures.
EQUIPMENT PREPARATION
Step 1:
Fill gear box with gear lube.
Step 2:
Fill hydraulic tank.
Step 3:
Fill all hoses and pump cases with hydraulic oil
before starting engine.
Step 4:
Connect battery.
Step 5:
Start engine.
Step 6:
Operate all hydraulic circuits several times to bleed
air.
Step 7:
Check for leaks.
d. Place bearings (5) on gears with snap rings on
inboard side (6).
BK-21
5
6
Step 2:
Apply surface sealant to the halves of the
transmission box.
BK-6.1
Step 3:
Assemble the halves of the transmission box by
aligning the match marks and install the perimeter
bolts.