Drive Train
Highway Class Paver/Finishers
A-19
R
ADIATOR
This procedure covers:
✓
Removal
Inspection/Specification
✓
Installation
Disassembly
Assembly
Adjustments
Special Cleaning
✓
Component Test
✓
Equipment Preparation
Machine Set-up
Special Tools
Fabricated Tools
• Engine housing raised.
✓
Cooling system
✓
None
• Machine blocked to prevent movement.
Pressure tester
• Battery disconnected.
• Coolant Catch container for coolant (10 gal., 40 L).