Drive Train
Highway Class Paver/Finishers
A-67
INSTALLATION
Step 1:
Install wheel.
NOTE
Use fork lift truck, if available, to install tire.
a. Attach a suitable lifting device to the tire.
b. Place wheel on hub.
c. Install lug nuts to hold wheel on hub. Torque to
320 lb-ft (434 N•m) dry torque, 240 lb-ft (325
N•m) wet torque.
0760-79
Step 2:
Install drive chain.
a. Place chain over tire sprocket and the axle
sprocket. Note: Install with cotter pins away from
tire.
b. Install link pins.
c. Install cotter pins to master link. This will secure
chain.
d. Adjust chain tension. See "Drive Chain and
Tightener Assembly".
e. Install chain guard.
BK-23
Step 3:
Lower tractor.
a. Jack or lift machine off hardwood blocking.
b. Remove blocks from under the tractor.
c. Lower tractor onto the ground.
Step 4:
Install splash guard in front of left tire if required.